Sunday, February 17, 2019

More Planning!!!

          I have already made a plan of how each week is going to go for our portfolio project, but now I want to get specific for our shoot.  Klaus and I have talked about our shoot, but not in much detail.  We both have the same end goal of having our shoot go as smoothly as possible and pretty much shoot all of it on March 2nd.  I want every single minute of Saturday to be planned so we can be as efficient as possible when we shoot.  Saturday is going to be a long day and knowing what we need to get done will be easier, especially using a storyboard and a finalized script for shooting.  I have planned this for filming:

The night before (March 1st):
-have props ready
-script and storyboard should be finalized by this date
-get equipment ready (cameras, mics, tripods, lights, reflector, headphones)
-confirm with actors of filming for next day

The day of (March 2nd):
-meet at 9:00am with supplies
-go to first location for shooting (most likely not filming scenes in order)
10:00am - second location
11:00am - third location
12:00pm - fourth location
1:00pm - fifth location

          I have allotted one hour for each location so far because once the storyboard and script is done, we will know how long we will need to be at each location.  Keeping with a tight schedule will keep us on track and film everything that we will need to so we don't have to go back for reshoots.  This plan will help with the overall process of filming on that day.